Oilfield Projects

33kV Substation at Taweelah Gas Compressor Station
Client: GASCO
Contractor: Gulf Star Cooling Services
Year: 2017 – running
Scope: Design, supply, installation and commissioning of HVAC system using chilled water system, expected cooling capacity required 207 TR
Replacement of Chiller Package for IA Compressor Lube Oil System (Los) with Enhanced Capacity st Bab
Client: GASCO
Contractor: Gulf Star Cooling Services
Year: 2016 – running
Scope: Design, supply, installation and commissioning of chiller skid system for lube oil cooling, including heat exchangers, tanks and pumps etc.
EPC for HP Connection to NGV Filling Stations (Phase 2a)
Client: GASCO
Contractor: Gulf Star Cooling Services
Year: 2016 – running
Scope: Supply, installation, start-up and commissioning of central air conditioning system for NGV filling station from GASCO
EPC for Upgrading of Substation-19 at Maqta
Client: GASCO
Contractor: CAE
Year: 2016 – running
Scope: Design, supply, installation, startup and commissioning of HVAC System for substation at Maqta, using a DX System along with ventilation systems for the building
Norm Handling, Treatment & Disposal Project at Al Beaat
Client: TAKREER
Contractor: Intecsa
Year: 2016 – running
Scope: Design, supply, installation and commissioning of 10 nos. buildings using chilled water system for main plant area and DX system for the remaining buildings with a total cooling capacity of 800 TR
EPC for Expansion of Storage Facility at Bab 13
Client: ADCO
Contractor: CAE
Year: 2016
Scope: Design, supply, installation and commissioning of 5 nos. shelters, scope includes HVAC and plumbing works. DX HVAC System used for all the shelters
Relocation of HVAC Units for Substation-502
Client: GASCO
Contractor: Gulf Star Cooling Services
Year: 2015
Scope: Supply, installation, startup and commissioning of split air conditioning; replacement of supply and return duct works complete with sound attenuators for 4 typical control rooms
Acoustic Treatment to HVAC Installation in OMS-2
Client: GASCO
Contractor: Gulf Star Cooling Services
Year: 2014
Scope: Supply, installation, startup and commissioning of split air conditioning; replacement of supply and return duct works complete with sound attenuators for 4 typical control rooms
Zirku Power Upgrade Project
Client: ZADCO
Contractor: Granite Construction Co.
Year: 2014 – Running
Scope: Design, supply, installation and commissioning of HVAC system for new substation at Zirku Island, using a DX system of approx. 100TR along with ventilation systems for the building
Renovation Of Das Island Multipurpose Sports Hall
Client: ADGAS – ADMA-OPCO
Contractor: Hexa
Year: 2014
Scope: Design, supply, installation and commissioning of squash and basketball courts; DX system is used with a total cooling capacity of 75TR
Construction Of Heritage Village – Habshan-5
Client: GASCO
Contractor: Al Hussain General Contracting
Year: 2014
Scope: Design, supply, installation and commissioning of Heritage Village building works, chilled water system along with ventilation system with a total cooling capacity of 42 ton
Yas-Mina Zayed Gas Pipeline
Client: GASCO
Contractor: Petrojet
Year: 2014
Scope: Design, supply, installation and commissioning E&I buildings in Al Saadiyat, Al Jubail and Yas Island; scope is supply and installation of DX systems along with ventilation systems for each building
Design & Construction of 132-33kV Substation at Ruwais
Client: ADNOC
Contractor: Lindenberg Emirates
Year: 2013
Scope: Supply, installation, startup and commissioning of central air conditioning system with total cooling capacity of 86 ton along with CO2 extract and ventilation system and fresh air system
NGV Filling Station – Phase-II
Client: GASCO
Contractor: Robt Stone
Year: 2013
Scope: Supply, installation, start-up and commissioning of central air conditioning system for NGV filling station from GASCO at Ruwais
Habshan-Maqta-Taweelah (HMT) Gas Pipeline Project
Client: GASCO
Contractor: Dodsal
Year: 2013 – 2014
Scope: Supply, installation, start-up and commissioning of central air conditioning system for GASCO control room 2X 14TR ducted package units along with explosion proof extract system
YLNG Upstream Project – Phase-II
Client: YLNG Company
Contractor: Gulf Star Colling Services
Year: 2013
Scope: Supply, packing and delivery of central air conditioning system for new management building in Yemen
Natural Gas Supply Pipeline From GASCO Fertil-II
Client: GASCO
Contractor: Robt Stone – NPCC
Year: 2012 – 2013
Scope: Supply, installation, start-up and commissioning of central air conditioning system for natural gas supply pipeline from GASCO Fertil-II at Ruwais
EPC of Shower & Tea Room Facilities at Ruwais Sulphur Granulation Plant
Client: GASCO
Contractor: GTM – CAPITAL
Year: 2012 – 2013
Scope: Supply, installation, start-up and commissioning of central air conditioning system for shower and tea room at GASCO Ruwais
Habshan-5 – Industrial Facilities HVAC Works
Client: GASCO
Contractor: Al Fara’a – CAE
Year: 2011 – 2013
Scope: Supply, installation, start-up and commissioning of central air conditioning system for GASCO Habshan; 5X 249 ton with total cooling capacity 1,245 ton complete with CW pumps and underground piping network
New Auditorium & Administration Building at Buhasa
Client: GASCO
Contractor: Al Fara’a – CAE
Year: 2011 – 2013
Scope: Supply, installation, start-up and commissioning of central air conditioning system for GASCO Buhasa; 2×60 ton + 2×69 ton air cooled chillers with total cooling capacity of 298 ton complete with CW pumps, underground piping network, internal piping networks, FAHUs, FCUs, Extract system etc.
NGV Filling Stations High Pressure Pipeline Connections
Client: GASCO
Contractor: Q Energy
Year: 2010 – 2011
Scope: Supply, installation, start-up and commissioning of central air conditioning system (6 buildings); 2×6 ton package units with total capacity of 12 ton per building
New Potable Water Generation Units at Das Island
Client: ADMA-OPCO
Contractor: Metito
Year: 2010 – 2011
Scope: Supply, installation, start-up and commissioning of central air conditioning system at Das Island, 2×45 ton package units with total cooling capacity 90 ton
Asab Accommodation Facilities (Phase-II) & Kitchen Extension, Lounges, Dining & Conference Room
Client: GASCO
Contractor: Granite Construction Co.
Year: 2010 – 2011
Scope: Supply, installation, start-up and commissioning of central air conditioning chilled water system; 5×265 ton air cooled chillers with total cooling capacity 1,325 ton complete with CW pumps, underground piping network, internal piping networks
Asab Accommodation Facilities (Phase-I) – 500 Bedrooms & Recreation Centre
Client: GASCO
Contractor: Granite Construction Co.
Year: 2008 – 2009
Scope: Supply, installation, start-up and commissioning of central air conditioning chilled water system; 4×188 ton + 3×188 ton air cooled chillers with total cooling capacity 1,316 ton complete with CW pumps, underground piping network
Permanent Training Center & Laboratory Building at Das Island
Client: ADGAS
Contractor: Granite Construction Co.
Year: 2008 – 2009
Scope: Supply, installation, start-up and commissioning of central air conditioning chilled water system; 3×165 ton air cooled chillers with total capacity 495 ton complete with CW pumps, underground piping network, internal piping networks
EGDS Upgrade – EPC Works for East & West System
Client: GASCO
Contractor: Dolphin Energy
Year: 2007 – 2008
Scope: Supply, installation, start-up and commissioning of central air DX conditioning system at four control cuildings (Taweelah Master Control Room, Taweelah New Workshop, Al-Maqta Gas Terminal and Al-Ain Gas Terminal)
Saih Rawl Chiller System
Client: PDO Oman
Contractor: GE Power Conversion
Year: 2007 – 2008
Scope: Supply, installation, start-up and commissioning of air cooled chillers with skids (5 Nos.), chilled water pumps, fresh water pumps and insulated water tanks all on skids
A/C Modification for the Existing Main Control Bldg. in AGD-1 Plant
Client: GASCO
Contractor: Bechtel
Year: 2007 – 2008
Scope: Supply, installation, start-up and commissioning of central air conditioning system; split ducted system and package units system
Habshan Non-Process Buildings (7 Bldgs.) Including Laboratories – HVAC works
Client: GASCO
Contractor: Granite Construction Co.
Year: 2007 – 2008
Scope: Supply, installation, start-up and commissioning of central air conditioning chilled water system; air cooled chillers complete with CW pumps, underground piping network, internal piping networks
Ruwais Housing Complex Expansion Central A/C System
Client: ADNOC
Contractor: Al Jaber Energy Services
Year: 2002
Scope: Supply, installation, start-up and commissioning of central air conditioning system at Ruwais housing complex expansion adding four schools
Buhasa Installation of Central A/C System
Client: ADCO
Contractor: UTS Carrier
Year: 2000
Scope: Supply, installation, start-up and commissioning of central air conditioning system at ADCO Buhasa Plant