Client: | GASCO |
---|---|
Contractor: | Gulf Star Cooling Services |
Year: | 2017 – running |
Scope: | Design, supply, installation and commissioning of HVAC system using chilled water system, expected cooling capacity required 207 TR |
Client: | GASCO |
---|---|
Contractor: | Gulf Star Cooling Services |
Year: | 2016 – running |
Scope: | Design, supply, installation and commissioning of chiller skid system for lube oil cooling, including heat exchangers, tanks and pumps etc. |
Client: | GASCO |
---|---|
Contractor: | Gulf Star Cooling Services |
Year: | 2016 – running |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system for NGV filling station from GASCO |
Client: | GASCO |
---|---|
Contractor: | CAE |
Year: | 2016 – running |
Scope: | Design, supply, installation, startup and commissioning of HVAC System for substation at Maqta, using a DX System along with ventilation systems for the building |
Client: | TAKREER |
---|---|
Contractor: | Intecsa |
Year: | 2016 – running |
Scope: | Design, supply, installation and commissioning of 10 nos. buildings using chilled water system for main plant area and DX system for the remaining buildings with a total cooling capacity of 800 TR |
Client: | ADCO |
---|---|
Contractor: | CAE |
Year: | 2016 |
Scope: | Design, supply, installation and commissioning of 5 nos. shelters, scope includes HVAC and plumbing works. DX HVAC System used for all the shelters |
Client: | GASCO |
---|---|
Contractor: | Gulf Star Cooling Services |
Year: | 2015 |
Scope: | Supply, installation, startup and commissioning of split air conditioning; replacement of supply and return duct works complete with sound attenuators for 4 typical control rooms |
Client: | GASCO |
---|---|
Contractor: | Gulf Star Cooling Services |
Year: | 2014 |
Scope: | Supply, installation, startup and commissioning of split air conditioning; replacement of supply and return duct works complete with sound attenuators for 4 typical control rooms |
Client: | ZADCO |
---|---|
Contractor: | Granite Construction Co. |
Year: | 2014 – Running |
Scope: | Design, supply, installation and commissioning of HVAC system for new substation at Zirku Island, using a DX system of approx. 100TR along with ventilation systems for the building |
Client: | ADGAS – ADMA-OPCO |
---|---|
Contractor: | Hexa |
Year: | 2014 |
Scope: | Design, supply, installation and commissioning of squash and basketball courts; DX system is used with a total cooling capacity of 75TR |
Client: | GASCO |
---|---|
Contractor: | Al Hussain General Contracting |
Year: | 2014 |
Scope: | Design, supply, installation and commissioning of Heritage Village building works, chilled water system along with ventilation system with a total cooling capacity of 42 ton |
Client: | GASCO |
---|---|
Contractor: | Petrojet |
Year: | 2014 |
Scope: | Design, supply, installation and commissioning E&I buildings in Al Saadiyat, Al Jubail and Yas Island; scope is supply and installation of DX systems along with ventilation systems for each building |
Client: | ADNOC |
---|---|
Contractor: | Lindenberg Emirates |
Year: | 2013 |
Scope: | Supply, installation, startup and commissioning of central air conditioning system with total cooling capacity of 86 ton along with CO2 extract and ventilation system and fresh air system |
Client: | GASCO |
---|---|
Contractor: | Robt Stone |
Year: | 2013 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system for NGV filling station from GASCO at Ruwais |
Client: | GASCO |
---|---|
Contractor: | Dodsal |
Year: | 2013 – 2014 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system for GASCO control room 2X 14TR ducted package units along with explosion proof extract system |
Client: | YLNG Company |
---|---|
Contractor: | Gulf Star Colling Services |
Year: | 2013 |
Scope: | Supply, packing and delivery of central air conditioning system for new management building in Yemen |
Client: | GASCO |
---|---|
Contractor: | Robt Stone – NPCC |
Year: | 2012 – 2013 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system for natural gas supply pipeline from GASCO Fertil-II at Ruwais |
Client: | GASCO |
---|---|
Contractor: | GTM – CAPITAL |
Year: | 2012 – 2013 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system for shower and tea room at GASCO Ruwais |
Client: | GASCO |
---|---|
Contractor: | Al Fara’a – CAE |
Year: | 2011 – 2013 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system for GASCO Habshan; 5X 249 ton with total cooling capacity 1,245 ton complete with CW pumps and underground piping network |
Client: | GASCO |
---|---|
Contractor: | Al Fara’a – CAE |
Year: | 2011 – 2013 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system for GASCO Buhasa; 2×60 ton + 2×69 ton air cooled chillers with total cooling capacity of 298 ton complete with CW pumps, underground piping network, internal piping networks, FAHUs, FCUs, Extract system etc. |
Client: | GASCO |
---|---|
Contractor: | Q Energy |
Year: | 2010 – 2011 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system (6 buildings); 2×6 ton package units with total capacity of 12 ton per building |
Client: | ADMA-OPCO |
---|---|
Contractor: | Metito |
Year: | 2010 – 2011 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system at Das Island, 2×45 ton package units with total cooling capacity 90 ton |
Client: | GASCO |
---|---|
Contractor: | Granite Construction Co. |
Year: | 2010 – 2011 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning chilled water system; 5×265 ton air cooled chillers with total cooling capacity 1,325 ton complete with CW pumps, underground piping network, internal piping networks |
Client: | GASCO |
---|---|
Contractor: | Granite Construction Co. |
Year: | 2008 – 2009 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning chilled water system; 4×188 ton + 3×188 ton air cooled chillers with total cooling capacity 1,316 ton complete with CW pumps, underground piping network |
Client: | ADGAS |
---|---|
Contractor: | Granite Construction Co. |
Year: | 2008 – 2009 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning chilled water system; 3×165 ton air cooled chillers with total capacity 495 ton complete with CW pumps, underground piping network, internal piping networks |
Client: | GASCO |
---|---|
Contractor: | Dolphin Energy |
Year: | 2007 – 2008 |
Scope: | Supply, installation, start-up and commissioning of central air DX conditioning system at four control cuildings (Taweelah Master Control Room, Taweelah New Workshop, Al-Maqta Gas Terminal and Al-Ain Gas Terminal) |
Client: | PDO Oman |
---|---|
Contractor: | GE Power Conversion |
Year: | 2007 – 2008 |
Scope: | Supply, installation, start-up and commissioning of air cooled chillers with skids (5 Nos.), chilled water pumps, fresh water pumps and insulated water tanks all on skids |
Client: | GASCO |
---|---|
Contractor: | Bechtel |
Year: | 2007 – 2008 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system; split ducted system and package units system |
Client: | GASCO |
---|---|
Contractor: | Granite Construction Co. |
Year: | 2007 – 2008 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning chilled water system; air cooled chillers complete with CW pumps, underground piping network, internal piping networks |
Client: | ADNOC |
---|---|
Contractor: | Al Jaber Energy Services |
Year: | 2002 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system at Ruwais housing complex expansion adding four schools |
Client: | ADCO |
---|---|
Contractor: | UTS Carrier |
Year: | 2000 |
Scope: | Supply, installation, start-up and commissioning of central air conditioning system at ADCO Buhasa Plant |